WT Architecture 11 December 2013 Finishing the services WT Architecture 11 December 2013 Giving the building some warmth with a wood burning stove.
WT Architecture 25 November 2013 Workings on the interior WT Architecture 25 November 2013 The envelope is complete.
WT Architecture 23 October 2013 Completing the exterior WT Architecture 23 October 2013 The last look before the scaffolding comes down.
WT Architecture 9 October 2013 Windows and insulation WT Architecture 9 October 2013 Getting ready for lining out with spruce plywood an plasterboard.
WT Architecture 18 September 2013 Completing the roof WT Architecture 18 September 2013 The interior is starting to resemble an inhabitable space.
WT Architecture 4 September 2013 Enclosing the new structure WT Architecture 4 September 2013 Using reclaimed slates from the original building
WT Architecture 22 August 2013 Constructing the timber frame roof WT Architecture 22 August 2013 A last look at the framing of the internal spaces before the roof goes on.
WT Architecture 8 August 2013 Timber construction WT Architecture 8 August 2013 Reaching first floor level
WT Architecture 29 July 2013 Installing the timber kit WT Architecture 29 July 2013 An exciting leap forward with the installation of the timber frame
WT Architecture 12 July 2013 A blazing hot day on site WT Architecture 12 July 2013 Excavation and completion of new openings in the kitchen
WT Architecture 4 July 2013 Drainage installed WT Architecture 4 July 2013 Drainage installed and new openings to the kitchen being made
WT Architecture 17 June 2013 Concrete and steelwork WT Architecture 17 June 2013 The new structural work starts as the first section of steelwork is erected.
WT Architecture 5 June 2013 Masonry work WT Architecture 5 June 2013 New masonry work is underway for the internal retaining walls, creating the step down from the ground floor.