March 2010

The last window to the front has been installed - only the front door to go in now.

For the big wall, only some black boarding to go in above the wall and this side will be complete externally.

The site is starting to dry out a bit after the very wet mid winter - largely exempt from the heaviest of the snow and ice that has gripped the mainland. Most importantly the sun is shining occasionally!

You can see one of the original garden walls, which are being extended, and views from the south west.

 Workshop with a view. The slate paving is down and the oak stair for the west wing in place.

The steel stair in the original ruin is installed. This is the biggest item to have been manufactured off-site. It has been made by DMH Blacksmiths of Inverness. Temporary stair treads have been put in place.

Slots for the living room blinds are shown and a render scratch coat on the 'tooth'/study tower.